Evacuation & Charging
Pull a deep vacuum, confirm a decay test, weigh in the charge, then verify superheat/subcool.
Approx. 120 min
Before you start
- •Line set and all joints have already passed a pressure/leak test — never pull a vacuum to find leaks.
- •Vacuum pump oil is fresh and the micron gauge is at the system (not at the pump), with core removal tools for speed.
- •Nameplate charge / metering-device type and the target superheat or subcool window are known.
Tools & materials
2-stage vacuum pump (fresh oil) · Micron (vacuum) gauge · Large-bore hoses + core removal tools · Accurate charging scale + refrigerant · Digital manifold + pipe clamp temp probes
View
0% complete