Install a Filter-Drier

Orient the arrow toward the metering device, braze with a nitrogen purge while heat-sinking the core, then pull a proper vacuum — and always fit a new drier when the system is opened.

Approx. 60 min

Before you start

  • System recovered (or pumped down/isolated per the job) so the liquid line can be opened safely — never braze on a charged/pressurized system.
  • Correct drier on the truck: matched to refrigerant, tonnage/flow, and connection (sweat vs flare) — a NEW drier, since the desiccant is hygroscopic and a used one is spent.
  • Nitrogen with a regulator set for a low purge flow, and a wet rag / heat-sink paste to protect the drier core.

Tools & materials

Brazing torch + rod (e.g. 15% sil-fos for copper-to-copper, brazing flux if to brass/steel) · Tube cutter + deburring tool · Nitrogen + regulator (for the brazing purge) · Wet rag / heat-sink compound · Vacuum pump + micron gauge

View

0% complete

Locate & orient

Braze it in

Evacuate & restore