Install a Heat-Pump Outdoor Unit

Set on risers/a stand above snow with room for defrost meltwater to drain, level on a pad with clearances, run the line set, then verify reversing-valve (O/B) operation, defrost, and configure auxiliary heat + balance point.

Approx. 300 min

Before you start

  • Indoor section (air handler with electric heat kit, or furnace as dual-fuel) and its backup-heat capacity are known, plus the thermostat type (heat pump aware, O vs B reversing-valve energize).
  • Refrigerant type, line-set sizing/length, and low-ambient operating range for the unit are known.
  • Site allows raising the unit on risers/a stand for the local snow depth, with a clear path for defrost meltwater away from the unit.

Tools & materials

Equipment stand/risers or wall brackets rated for the unit weight · Level, pad (composite/precast) or stand hardware · Refrigerant/brazing or press tools, nitrogen for purge · Digital manifold + clamp temp probes, clamp meter · Heat-pump aware thermostat / control with O/B + aux-heat + balance-point settings

View

0% complete

Set above snow & defrost water

Line set & low ambient

Reversing valve, defrost & aux heat

Verify heat & cool