Install the Air Handler / Coil

Mount level, build the drain + P-trap + float switch, and seal the plenum transitions.

Approx. 90 min

Before you start

  • Coil/air handler matches the condenser (AHRI) and the metering device (TXV/piston) is correct for the system.
  • Return/supply plenum and transitions sized to the unit's airflow (CFM) — undersized ducts starve the coil.
  • Drain route planned to an approved termination with the correct pitch; secondary drain or float switch path identified.

Tools & materials

Hanging strap / stand / brackets · Level · PVC pipe, primer, cement, P-trap fittings · Float / overflow switch · Mastic or UL-181 foil tape, sheet-metal screws

View

0% complete

Mount the unit

Condensate train

Plenum & transitions