Set the Condensing Unit
Pad, level, clearances, hold-downs, disconnect, and whip — set it right so it drains and breathes.
Approx. 60 min
Before you start
- •Location chosen with adequate airflow clearance and away from bedroom windows / dryer vents.
- •Pad or stand on hand (composite pad on stable, drained base; brackets for flood/snow zones).
- •Disconnect, whip, and correct breaker sized to the unit's MCA/MOCP available.
Tools & materials
Composite/concrete pad or wall brackets · 4-ft level · Drill / impact + masonry or tapcon hardware · Refrigerant-rated whip / liquid-tight conduit · Hurricane / seismic hold-down straps where required by code
View
0% complete