Set the Condensing Unit

Pad, level, clearances, hold-downs, disconnect, and whip — set it right so it drains and breathes.

Approx. 60 min

Before you start

  • Location chosen with adequate airflow clearance and away from bedroom windows / dryer vents.
  • Pad or stand on hand (composite pad on stable, drained base; brackets for flood/snow zones).
  • Disconnect, whip, and correct breaker sized to the unit's MCA/MOCP available.

Tools & materials

Composite/concrete pad or wall brackets · 4-ft level · Drill / impact + masonry or tapcon hardware · Refrigerant-rated whip / liquid-tight conduit · Hurricane / seismic hold-down straps where required by code

View

0% complete

Site & base

Secure the unit

Disconnect & whip