Split-System AC / Heat Pump Install
Whole-job check-off: pre-job, set equipment, line set, electrical, evac, charge, commission.
Approx. 420 min
Before you start
- •Matched AHRI system (condenser + coil/air handler) confirmed — mismatched coils void the rating and the warranty.
- •Correct refrigerant type for the equipment (R-410A vs R-454B/R-32) and a dedicated, clean gauge set/recovery tank for it.
- •Local permit pulled and load calc (Manual J) on file so equipment is sized to the house, not the old box.
- •Confirm electrical service has capacity for the new unit's MCA/MOCP before you start.
Tools & materials
Recovery machine + recovery tank (for changeouts) · Micron gauge + 2-stage vacuum pump · Nitrogen + regulator · Brazing kit or ProPress jaws · Digital manifold + accurate charging scale · Torque wrench, level, drill/impact · Multimeter + clamp meter